LVIA - HANGAR 11
Lehigh Valley International Airport - Hangar 11 is under construction and scheduled for a Fall 2019 completion.
This is a 54,000 SF, hybrid pre-engineered / conventionally framed steel structure built on micro-piles and grade beams.
Vertek was hired to perform the pre-construction and construction phase services for the General Contractor.